Tweet |
Custom Search
|
|
|
||
TM 55-1905-242-14
OPERATOR MAINTENANCE
FOR LANDING CRAFT, MECHANIZED (LCM-8) (ALL VESSELS WITH MOD 2 APPLICATION)
OPERATOR TROUBLESHOOTING PROCEDURES
OILY WATER COLLECTION SYSTEM
INITIAL SETUP:
Personnel Required:
References:
One Watercraft Engineer, 88L
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
1. Oily water collection
1.
Check that the valves are aligned properly
Align valves properly for
pump will not pump
for the desired operation (WP 0026 00).
the desired operation.
water.
2.
Check that the oily water suction strainer is
Clean the strainer.
clean.
2. Oily water collection
Check that the switch and the circuit breaker
Turn ON the switch and
pump will not run.
are ON.
circuit breaker.
END OF WORK PACKAGE
0045 00-1/2 blank
0045 00-1
|
||