Custom Search
 
  
 
TM 55-1905-242-14
0053 00
ITEM
INTERV L
A
MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
56
Heating, Ventila-
tion, and Air Con-
ditioning
Before
0.3
a. Cooling Unit
Turn ON cooling unit and check that
Cooling unit does not
unit heats and cools. Check that fan
heat or cool.
blows in all positions.
Fan does not operate.
Before
0.5
b. Ventilation Fan
Check all ventilation fans for secure
Fan inoperative.
mounting. Check for tight connection
through bulkhead. Check proper air-
flow (out of the compartment).
HULL ABOVE
WATERLINE
57
Ramp Winch
During
1.0
Winch
Inspect winch to ensure that it operates Winch is not capable of
Assembly
freely with no binding in either
operating ramp.
direction. Check to see if winch
vibrated during operation.
FORE DECK
58
Ramp Hydraulic
System
During
0.5
a. Hydraulic Pump
Inspect pumps for leaks and proper
Class III leakage noted.
hydraulic connections. Ensure that
pumps operate and provide adequate
Pump does not supply
hydraulic pressure to system.
sufficient pressure to
operate ramp.
During
0.5
b. Ramp Hoist
Inspect valve for leaks or improper
Class III leakage noted.
Control Valve
function of valve in all positions
(NEUTRAL, RAISE, and LOWER).
Valve does not operate
ramp.
AFT DECK
59
During
0.5
Fuel Tanks, Piping, Sound fuel tanks to determine fuel level.
Valves, Hoses,
Add fuel as necessary. Record fuel
and Fittings
levels in log.
ENGINE ROOM
60
During
0.1
Monitor ammeters. Charging rate will
System not charging
Belts
vary depending upon load, but should
properly.
always stay in the charge range.
0053 00-11


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business