Tweet |
Custom Search
|
|
|
||
TM 55-1905-242-14
0053 00
ITEM
INTERV L
A
MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
Monthly
0.2
e. Cable and
Apply four to six shots of grease to the
Sheaves
sheave grease fittings. See table 3.
WARNING
Do not apply grease to the wire rope
by hand. Broken strands of wire can
cause injury to personnel. Apply
grease only with a brush.
Monthly
2.5
Using a brush, apply a thin coat of
wire rope grease to the full length of the
wire rope.
Monthly
0.2
f. Chains
Inspect chain stops and load binders
One or both chains are
for cracks, rust, and other damage.
defective or missing.
Check chain for missing and weak
links. Ensure that chains support ramp
One or both load
equally. Ensure that load binders
binders are defective
operate properly.
or missing.
91
Crane
Monthly
1.0
a. Control Bank
Check all bolts, lines, and fittings for
Damaged or loose lines
signs of damage. Check that the valves
or bolts.
are free of rust and dirt. Ensure that
all warning and instruction labels are
Missing or illegible
intact.
labels.
Monthly
0.5
b. Extension
Inspect extension assembly for deform- Extension assembly is
Assembly
ity and obvious damage. Extend and
deformed or damaged.
retract both sections and check for
noise, binding, and jerky operation.
Monthly
1.0
c. Boom
Apply four to six shots of grease to all
Assembly
of the grease fittings on the crane. See
table 1.
AFT DECK
92
Monthly
0.5
Searchlight
Lubricate fixture pivots with lubricant
specified in table 1. Work light through
full range of motion to distribute
lubricant.
93
Monthly
0.5
Antenna
Inspect all antenna assemblies for
Any antenna is
Assemblies
mounting. Inspect all antenna wiring
damaged enough to
for damage.
affect operation of its
communication system.
0053 00-17
|
||