TM 55-1905-242-14
0053 00
ITEM
INTERV L
A
MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
Monthly
0.5
b. Cylinder Assem- Inspect for secure mounting. Check for Damage to cylinder or
bly, FM-200
damage to cylinder and discharge
discharge fittings.
fittings.
FOREDECK
118
Periodic
0.5
Ramp Locking
Grease 3 grease fittings on each latch
(50 Hours)
Hydraulic
assembly. Pump 3 strokes of grease
Cylinders
into each fitting. See table 1.
0053 00-21