Custom Search
 
  
 
TM 55-1905-242-14
UNIT MAINTENANCE
FOR LANDING CRAFT, MECHANIZED (LCM-8) (ALL VESSELS WITH MOD 2 APPLICATION)
MAINTENANCE INSTRUCTIONS
UNIT PMCS INCLUDING LUBRICATION INSTRUCTIONS
ITEM INTERVAL
MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
1
Monthly
0.5
Hydraulic Starting
Check accumulator for nitrogen pre-
Low accumulator
Accumulators
charge (WP 0022 00). Notify direct
precharge pressure.
support maintenance if the accumulator
precharge pressure is low.
2
Quarterly
0.5
Ramp Winch
Inspect connections for leaks and
Class III leakage noted.
Hydraulic Motor
tighten as necessary. Tighten mount-
ing bolts as necessary.
3
Quarterly
0.5
Rudder and Tiller
Check security of all nuts and bolts.
Tighten as necessary.
4
Quarterly
0.5
Rudder Angle
Inspect transmitter for proper function-
Indicator
ing. Ensure that rudder moves through
full range of motion. Make checks while
observing rudder angle indicator.
END OF WORK PACKAGE
0054 00-1/2 blank
0054 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business