Custom Search
 
  
 
TM 55-1905-242-14
OPERATOR MAINTENANCE
FOR LANDING CRAFT, MECHANIZED (LCM-8) (ALL VESSELS WITH MOD 2 APPLICATION)
ELECTRIC TOILET, TEST
INITIAL SETUP:
Personnel Required:
Equipment Condition:
Two Watercraft Engineers, 88L
Electric toilet seacock OPEN
TEST
1.
Place a small amount of toilet tissue in the bowl (1).
2.
Press the flush button mounted on the aft bulkhead of the water closet compartment.
3.
As the electric toilet flushes, check all of the plumbing joints for signs of leakage.
4.
Ensure that the bowl (1) pumps dry.
5.
If leakage is noted, or if the bowl fails to pump dry, notify unit maintenance for repair.
1
END OF WORK PACKAGE
0074 00-1/2 blank


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business