TM 55-1905-242-14
0188 00
1
2
3
5
4
INSTALLATION
1.
Position the hand pump (5) in its enclosure and secure it with the mounting bolts (4).
2.
Remove the caps from the union (3) and connect the union to the hand pump (5).
3.
Remove the lockouts and tagouts and check the operation of the system, ensuring that the hand pump lowers and halts
the bow ramp properly and that no leaks are present.
4.
Dispose of used hydraulic fluid and contaminated materials in accordance with local regulations.
END OF WORK PACKAGE
0188 00-2