Tweet |
Custom Search
|
|
|
||
TM 55-1905-242-14
GENERAL SUPPORT MAINTENANCE
FOR LANDING CRAFT, MECHANIZED (LCM-8) (ALL VESSELS WITH MOD 2 APPLICATION)
STUFFING BOX, REPAIR/REPLACE
INITIAL SETUP:
Tools and Special Tools:
Personnel Required:
Tool Kit, Mechanic's Rail and Marine (Item 1,
Two Watercraft Engineers, 88L
Table 1, WP 0230 00)
Materials/Parts:
Equipment Condition:
Packing, Preformed
Propulsion engines secured, locked out, and
tagged out IAW FM 55-502
References:
Vessel in drydock or beached for replacement
FM 55-502
Propeller shaft removed for replacement
TM 55-1905-242-24P (WP 0023)
REPAIR
1.
Loosen the hose clamps (1) and remove them from the flexible hose (2) if the clamps will be replaced.
2.
Remove the two upper bolts (3) and nuts (4) securing the stuffing box (5) to the packing brace (6).
3.
Loosen the two lower bolts (7) and nuts (8) securing the packing braces (6) (one on either side) to the mounting plate (9).
4.
Slide the forward portion of the stuffing box (5) up the propeller shaft (10) and remove the old packing from the aft portion
of the stuffing box.
5
10
2
1
4
6
7
3
8
9
5.
Procure new packing material.
6.
Wrap the packing material (11) around the propeller shaft (10) to determine the proper length for the new packing material
sections. Cut the ends square and allow them to overlap approximately 1/16 inch (0.16 mm) to permit a snug fit in the
stuffing box.
7.
Slide the packing material sections into the aft section of the stuffing box (5). Stagger the end gaps of the packing
material section to prevent excessive leakage.
0203 00-1
|
||