Custom Search
 
  
 
TM 55-1905-242-14
GENERAL SUPPORT MAINTENANCE
FOR LANDING CRAFT, MECHANIZED (LCM-8) (ALL VESSELS WITH MOD 2 APPLICATION)
MUFFLERS, PIPING, AND LAGGING, REPLACE/REPAIR
INITIAL SETUP:
Tools and Special Tools:
Materials/Parts:
Tool Kit, Mechanic's Rail and Marine (Item 1,
Gloves, Anti-Flash (Item 13, Table 2, WP 0230 00)
Table 1, WP 0230 00)
Wire, Nonelectrical (Item 25, Table 2, WP 0230 00)
Gasket (p/n 13226E9449M7, qty 12)
Equipment Condition:
Gasket (p/n MIL-G-14243NONASBESTOS, qty 8)
Propulsion engines secured, locked out, and
Gasket (p/n 13226E9449M15, qty 4)
tagged out IAW FM 55-502
References:
Raw water system seacock CLOSED, locked
out, and tagged out IAW FM 55-502
FM 55-502
Engine room certified safe for HOT WORK IAW
FM 55-502
MIL-STD-769J
TM 55-1905-242-24P (WP 0024)
Personnel Required:
Two Watercraft Engineers, 88L
REMOVAL
WARNING
Always wear gloves when handling hot engine components. Handling hot engine compo-
nents with bare hands or skin may result in severe burns, serious injury, or death.
1.
Remove the lagging (1) from the exhaust system by removing the wire (2) from the clips (3). Put the lagging aside for
installation unless it is damaged and needs replacement.
1
3
2
0204 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business