Custom Search
 
  
 
TM 55-1925-273-10-1
OPERATOR'S MANUAL
INLAND AND COASTAL LARGE TUG (LT)
OPERATION UNDER USUAL CONDITIONS
POTABLE WATER SYSTEM
INITIAL SETUP:
References:
Personnel Required:
One Watercraft Engineer, 88L
PURPOSE
This work package contains the following procedures:
1. Main potable water system setup.
2. Place hot water heaters online.
3. Place the shipwide potable water system online.
4. Reverse osmosis units operating procedure.
5. Brominator operating procedure.
NOTE
Verify that the marine sanitation device is operational before using the potable water system.
MAIN POTABLE WATER SYSTEM SETUP
1.
Align the electrical system as follows:
a.
At the main switchboard in the EOS, set the AUX MACH SPACE NO.2 PWR PNL NO.5 circuit breaker (figure 1,
item 1) to the ON position.
1
2
4
3
Figure 1. EOS Main Switchboard
0080 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business