Custom Search
 
  
 
TM 55-1925-273-10-1
OPERATOR'S MANUAL
INLAND AND COASTAL LARGE TUG (LT)
OPERATION UNDER USUAL CONDITIONS
COMMISSARY EQUIPMENT
INITIAL SETUP:
Personnel Required:
Tools and Special Tools:
One Crewmember, Any MOS
Suitable Drain Pan
GALLEY VENTILATOR HOOD
PREPARATION FOR USE
1.
At the main switchboard in the EOS (figure 1, item 1), set the GALLEY 440 V PWR. PNL. #2 circuit breaker (figure 1,
item 2) to ON.
2.
At 440V power panel No. 2 (figure 2, item 1), set the following circuit breakers to the ON position:
a.
REHEATER 1-23-2. (figure 2, item 2)
b.
GALLEY SUPPLY FAN S1-22-4/CONTROLLER FOR GALLEY EXTRACT FAN E1-37-1. (figure 2, item 3)
c.
GALLEY EXHAUST FAN E1-37-1/CONTROLLER FOR GALLEY SUPPLY FAN S1-22-4. (figure 2, item 4)
3.
At the galley supply fan controller located in the main deck fan room and the galley exhaust fan located in the galley,
perform or observe the following:
a.
Set the ON-OFF switch (figure 3, item 1) to the ON position.
b.
The POWER AVAILABLE indicator (figure 3, item 2) will illuminate.
2
3
1
Figure 1. Main Switchboard
0091 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business