Remove the cable from the shipboard shore power connector (figure 1).
7.
CLOSE and secure the shore power connector.
8.
Coordinate the cable haul-in between the onboard and the dockside crew.
9.
Stow the shore power cable in the stowage rack.
RIGGING THE GANGPLANK
WARNING
Never use the crane for any type of human support or transportation. The operator will
never lift a load over other personnel. Personnel will not walk under a hoisted load. Opera-
tor will not attempt to hoist the load until conditions allow safe operation. Ensure that the
load comes to a complete stop and is stable before changing direction of travel of the crane
boom. Failure to observe these warnings could result in serious injury or death.
1.
Start the central hydraulic system (WP 0076 00).
2.
Operate the crane (WP 0086 00) into position over the gangplank (figure 4, item 1).
3.
Ensure that the lifting sling (figure 4, item 2) is securely attached at lift points (figure 4, item 3).
4
2
3
3
3
1
3
Figure 4. Rigging the Gangplank
0094 00-6


 