Tweet |
Custom Search
|
|
|
||
TM 55-1925-273-10-1
0094 00
4.
Attach the crane hook to the sling lifting ring (figure 4, item 4).
5.
Operate the crane (WP 0086 00) to move the gangplank (figure 4, item 1) into position.
6.
Install the side rails on the gangplank (figure 4, item 1).
7.
Remove the sling from the gangplank (figure 4, item 1) and secure the crane (WP 0086 00).
8.
Secure the gangplank to the vessel by placing lines through each end slot and securing the lines to the vessel.
9.
Secure the central hydraulic system (WP 0076 00).
STOWING THE GANGPLANK
WARNING
Never use the crane for any type of human support or transportation. The operator will
never lift a load over other personnel. Personnel will not walk under a hoisted load. Opera-
tor will not attempt to hoist the load until conditions allow safe operation. Ensure that the
load comes to a complete stop and is stable before changing direction of travel of the crane
boom. Failure to observe these warnings could result in serious injury or death.
1.
Start the central hydraulic system (WP 0076 00).
2.
Operate the crane (WP 0086 00) into position over the gangplank (figure 4, item 1).
3.
Remove the handrails from the gangplank (figure 4, item 1).
4.
Ensure that the lifting sling (figure 4, item 2) is securely attached at the lift points (figure 4, item 3).
5.
Attach the crane hook to the sling lifting ring (figure 4, item 4).
6.
Prepare the gangplank by removing the lines securing the gangplank to the LT.
7.
Operate the crane (WP 0086 00) as necessary to position the gangplank on the storage brackets.
8.
Secure the gangplank in the stowed position.
9.
Remove the sling and secure the crane (WP 0086 00).
10. Secure the central hydraulic system (WP 0076 00).
END OF WORK PACKAGE
0094 00-7/8 blank
0094 00-7
|
||