Custom Search
 
  
 
TM 55-1925-273-10-2
OPERATOR'S MANUAL
INLAND AND COASTAL LARGE TUG (LT)
OPERATIONAL CHECKOUT
To complete the operational checkout:
1.
Perform all before PMCS items.
2.
Perform all system startup procedures as detailed in the following work packages:
Work Package
Title
(Volume 1)
WP 0068 00
Operation Under Usual Conditions: Preparation for Use
WP 0069 00
Operation Under Usual Conditions: Power Generation
WP 0070 00
Operation Under Usual Conditions: Compressed Air System
WP 0071 00
Operation Under Usual Conditions: Fire Main, General Service, Aqueous Film Forming Foam
(AFFF), and Washdown Countermeasure System
WP 0072 00
Operation Under Usual Conditions: Main Propulsion System
WP 0073 00
Operation Under Usual Conditions: Lube Oil Purification and Transfer Piping System
WP 0074 00
Operation Under Usual Conditions: Fuel Oil Fill, Transfer, and Supply System
WP 0075 00
Operation Under Usual Conditions: Bow Thruster
WP 0076 00
Operation Under Usual Conditions: Hydraulic System
WP 0077 00
Operation Under Usual Conditions: Steering System
WP 0078 00
Operation Under Usual Conditions: Tank Level Indicator System
WP 0079 00
Operation Under Usual Conditions: Bilge/Ballast Systems
WP 0080 00
Operation Under Usual Conditions: Potable Water System
WP 0081 00
Operation Under Usual Conditions: Marine Sanitation Device
WP 0082 00
Operation Under Usual Conditions: Heating, Ventilation, Air Conditioning, and Refrigeration
(HVACR) Systems
WP 0083 00
Operation Under Usual Conditions: Interncommunication and Sound Powered Telephone Systems
WP 0084 00
Operation Under Usual Conditions: Engine Order Telegraph and General Alarm Systems
END OF WORK PACKAGE


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business