TM 55-1925-273-10-2
OPERATOR'S MANUAL
INLAND AND COASTAL LARGE TUG (LT)
PREVENTIVE MAINTENANCE CHECKS AND SERVICES INCLUDING LUBRICATION
01 LEVEL FAN ROOMS
Table 1. Preventive Maintenance Checks and Services Including Lubrication
ITEM INTERVAL MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
1
Before
0.2
REHEATER
Inspect unit for obvious damage.
Unit damaged or
missing or broken
switches.
2
Before
0.2
FAN COIL UNIT
Grease fan and motor with general
Fails to operate.
purpose grease. Apply 1-2 shots per
fitting to each of the four grease fittings.
Observe the general condition of the unit.
3
During
0.2
FAN COIL UNIT
Observe unit for unusual noises or
Fails to operate.
excessive vibration.
Grease Fittings
Reheater
Fan Coil Unit


 