TM 5-1940-277-20
TM 1940-20/2
2-12. DETAILED PROCEDURE GENERAL INFORMATION.
a. Resources required are not listed unless they apply to the procedure.
b. Personnel required are listed only if the task requires more than one. If PERSONNEL are not
listed it means that one person can do the task.
c. The normal standard equipment condition to start a maintenance task is power (MASTER
SWITCH) OFF. EQUIPMENT CONDITION is not listed unless some other condition is required
besides the power (MASTER SWITCH) being OFF.
d. The MK1 and MK2 engines WILL NOT be operated out of water for more than 20 minutes at idle
speed. Any maintenance task step that requries engine operation MUST BE performed with the
boat in water or by following the procedures on paragraph 3-155 for MK1 or paragraph 3-156 for
MK2, out of water engine operation.
e. Standard maintenance procedure requires that upon completion of a maintenance action a
component function and performance check be conducted to assure no leakage or malfunction
exists. If leakage or malfunction is found repeat the maintenance procedure to correct problem.
f. Standard maintenance procedure requires that an operational check be performed after
completion of repairs if possible. This step is not called out as part of the procedure. The
operator's manual TM 5-1940-277-10 should be consulted for information on boat operation.
g. Bleed fuel system anytime work has been performed on fuel system components (paragraph 3-64).