Custom Search
 
  
 
TM 5-1940-277-20
TM 1940-20/2
3-152. BUOYANCY MATERIAL REMOVAL AND INSTALLATION INSTRUCTIONS
TOOLS: None Required
REPLACEMENT CRlTERIA: Blocks will be replaced if oil or fuel soaked (not stained), if cracked through, or if large
chunks broken out. Missing buoyancy material must not exceed 5% of total volume of
REMOVE: (ENGINE COMPARTMENT (Block No. 29 thru 36)
NOTE
Buoyancy blocks are numbered on the back or side and must be removed before number
is visible.
REMOVE:
1.
Open and secure engine hatches (refer to paragraph 3-154).
2.
Unbuckle four nylon straps (1) securing holding plate (2).
Remove holding plate (2) and store out of work area.
3.
3-321


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business