Custom Search
 
  
 
TM 5-2010-205-14
4-17. REPAIR/REPLACE EXPANSION TANK ASSEMBLY
This Task Covers: a. Inspect b. Repair c. Replacement
_____________
INITIAL SETUP
Tools Required
Equipment Conditions
Tool Kit, General
Engine Shutdown (para 2-11).
Mechanics (Appendix B,
Battery Disconnected (para 4-58).
Item 1)
Nylon Strap
Materials/Parts Required
Personnel Required
Cotton Rags (Appendix E,
2 persons
Item 3)
Permanent Antifreeze
________
1. Inspect for loose bolts (3).
2. Inspect for leaks around cap (2) and gaskets (1) on tank (4).
_______
REPAIR Repair is limited to the replacement of defective components.
______________
REPLACEMENT
1. Remove screws (5) to remove front cover (6).
2. Loosen hose clamps (7).
3. Remove hoses (8, 9, and 10) from heat exchanger.
4. Remove fuel lines (11) from junction block (12).
5. Remove bolts (13) and junction block (12) from engine.
6. Remove hoses (14) and (15) from. heat exchanger.
NOTE
The weight of the unit is approximately 85 lb.
4-22


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business