Custom Search
 
  
 
TM 5-2010-205-14
5-21.
REPAIR/REPLACE VALVE MECHANISM ASSEMBLY
This Task Covers:
a. Repair
b. Replacement
c. Adjust
INITIAL SETUP
Tools Required
Equipment Conditions
Tool Kit, General Mechanics
Engine Shutdown (para 2-11).
Battery Disconnected (para 4-58).
Shop Equipment (Appendix B,
Air Intake Filter Removed
Item 4)
PCV Lines Removed (para 4-33).
Valve Covers Removed (para 4-30).
Materials/Parts Required
Personnel Required
Cotton Rags (Appendix E,
1 Person
Item 3)
Cleaning Solution (Appendix E,
Item 1)
Gasket Sealing Compound
Valve Mechanism Assembly
P/N 9N3603
Bolt P/N MS90728-43
Tappet P/N 9L6931
Bolt P/N MS90728-40
Rocker Arm P/N 2W8271
Washer P/N 2W6047
Screw P/N 5S5917
Nut P/N 9L7712
Washer P/N 9L8076
Shaft P/N 9L9315
Washer P/N 9M1974
Holder P/N 9N0141
Push Rod P/N 9N6500
Gasket P/N 9L8020
Gasket P/N 9L8786
Gasket P/N 9L8837
Filter Element P/N 7W5040
5-42


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business