Custom Search
 
  
 
TM 5-2010-205-14
5-32. REPLACE LIFT CYLINDER ASSEMBLY
This Task Covers: a. Replacement
INITIAL SETUP
Tools Required
Equipment Conditions
Tool Kit, General Mechanics
Engine Shutdown (para 2-11).
Battery Disconnected (para 4-58).
Hoist
Materials/Parts Required
Personnel Required
Cotton Rags (Appendix E,
2 Persons
Item 3)
Cylinder Assembly
P/N TH5036048PA-00
Packing P/N 10033
Cup P/N 10026
Packing P/N 10055
Retainer P/N 10085
Ring P/N 10714
Seal P/N 10008
Figure 5-29. Lift Assembly
5-83


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business