TM 5-2805-261-13
4-19. CONDENSERS REMOVAL/INSTALLATION
This task covers:
Removal/installation of condensers.
INITIAL SETUP :
Tools:
Equipment Condition:
Universal puller
Motor OFF
Materials/Parts:
As required
Personnel Required:
Approximate Time Required (minutes):
1 Mechanic
180
LOCATION/ITEM
ACTION
REMARKS
REMOVAL
1. Starter
Remove.
See para 3-9.
2. Flywheel
Remove.
See para 4-17.
3. Capscrew (1) and
Remove from lead.
washer (2)
4. Fastening capscrew (3)
Remove.
5. Condenser (4)
Remove.
INSTALLATION
1. Condenser (4)
Hold in position and
install fastening capscrew
(3).
Figure 4-16. Condenser
2. Lead
Fasten with capscrew (1)
and washer (2).
3. Flywheel
Install.
See para 4-17.
4. Starter
Install.
See para 3-9.
4-26
|
||