Tweet |
Custom Search
|
|
|
||
TM 55-1905-219-14-2
2-101. SEWAGE SYSTEM.
a.
The sewage system consists of the following:
o
Urinal
o
Two water closets
o
Overboard discharge
o
Two discharge pumps
o
Two macerator pumps
o
Air pump and
o
Associated valves and piping
h.
The urinal and water closets are flushed with fresh water. Refer to paragraph 2-73 for operation of the fresh water
system.
Federal law prohibits discharge of sewage into restricted water.
c.
Refer to the following procedures for operating the sewage system:
DESCRIPTION
PARAGRAPH
Normal Operation
Overboard Discharge Holding Tank
Overboard Discharge - Macerator Pump
2-102. SEWAGE SYSTEM - NORMAL OPERATION.
The procedure for initial start-up and normal operation (Figure FO-54) of the sewage system is as follows:
a.
Engine Access Room.
(1)
Place circuit breaker #12 on power distribution panel (P-400) in the ON position.
2-448
|
||