TM 55-1905-221-14-2
RAMP HOIST COUNTERBALANCE VAVE (Continued).
L
LOCATION/ITEM
ACTION
REMARKS
ASSEMBLY (Cont)
g. Install counterbalance valve
spring (8), and spring
follower (7).
h. Install adjusting screw nut
If removed.
(6) on adjusting screw (4),
and secure with setscrew (5).
Install adjusting screw (4).
i.
Position new gasket (3) in
place on valve body (22), and
install top cap (2) using six
socket head cap screws (1).
INSTALLATION
7.
Lines, Ppe
i
a. Position counterbalance valve
Connections,
(4) in place.
and Winch
Cable
b. Remove caps (3) from open
ends.
c. Reconnect line (2).
d. Close ball valve (1).
5-99