TM 55-1905-221-14-2
5-6.3. RAMP HOIST COUNTERBALANCE VALVE (Continued).
LOCATION/ITEM
ACTION
REMARKS
ASSEMBLY (Cont)
6.
Counter-
a. Install valve seat (21) in
balance
body (22).
Valve
b. Install packing (20) over
orifice plug, and install
plug (19).
c. Install valve spool (18),
plunger (17), and pipe
plug (16).
d. Install spring (15), and flow
control valve spool (14).
e. Install packings (13 and 12)
into valve body (22).
f.
Position bottom cap (11) in
place on valve body (22) and
secure with three socket cap
screws (10), and seven socket
head cap screws (9).
5-98