Custom Search
 
  
 
TM 55-1905-221-14-4
6-41. POWER TAKE OFF COUPLING AND VIBRATION DAMPER (Continued).
LOCATION/ITEM
ACTION
REMARKS
REMOVAL (Cont)
r. Attach a suitable lifting sling
and chain hoist to the front
engine lifter bracket. Then,
lift the front end of the engine
just enough to free the supports
from the base.
s. Remove four bolts (25) and
Bolts are 1/2-13
X 2-3/4 inch.
t. Remove two bolts (27) and lock-
Bolts are 3/8-16
washers (28).
X 2 inch.
u. Remove two bolts (29) and lock-
Bolts are 1/2-13
washers (30).
X 3-1/4 inch.
6-927


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business