Custom Search
 
  
 
TM 55-1905-223-10
NOTE
Alarm siren will sound in main engine room. Discharge of HALON will be delayed for
60 seconds to allow evacuation of main engine room personnel. Discharge of HALON
is completed in 10 seconds.
During the 60-second warning time, four PRESSURE OPERATED SWITCHES automatically
shut down the main engine room console, two main engines, two ship service diesel generators,
fuel oil supply pumps, and the ventilation system in the main engine room. Before this
equipment can be restarted, the four PRESSURE OPERATED SWITCHES located near the
HALON bottles on the forward bulkhead of the emergency generator room must be reset.
The resetting of the four PRESSURE OPERATED SWITCHES does not reset the HALON
1301 Fire Suppression System. The HALON and CO cylinders must be recharged or
replaced and the pull boxes reset by depot maintenance when the LCU is docked.
(2) Reset plunger. After the fire has been extinguished, and at least 30 minutes have passed, and
equipment is to be restarted, reset the four PRESSURE OPERATED SWITCHES (FIGURE 2-159)
located near the HALON bottles on the forward bulkhead of the Emergency Generator Room by pushing
RESET PLUNGER (1) down to the SET position.
1. RESET PLUNGER
FIGURE 2-159. Pressure Operated Switch.
2-445


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business