Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-16
CHAPTER 2
UNIT MAINTENANCE INSTRUCTIONS
Page
Repair Parts, Special Tools; Test, Measurement, and
Diagnostic Equipment (TMDE); and Support Equipment .....................................................
Service Upon Receipt...........................................................................................................
Unit Preventive Maintenance Checks and Services (PMCS)...............................................
Unit Maintenance Troubleshooting.......................................................................................
Unit Maintenance Procedures ..............................................................................................
Preparation for Storage or Shipment ...................................................................................
SECTION I. REPAIR PARTS, SPECIAL TOOLS; TEST, MEASURNT,
AND DIAGNOSTIC EQUIPMENT (TMDE); AND SUPPORT EQUIPSM
2-1.
Common Tools and Equipment. For authorized common tools and equipment, refer to the Modified Table of
Organization and Equipment (MTOE) applicable to your organization.
2-2.
Special Tools, TMDE, and Support Equipment. Special tools; test, measurement, and diagnostic equipment;
and support equipment requirements are listed and illustrated in the Repair Parts and Special Tools List (RPSTL), TM 55-
1905-223-24P. These items are also listed in the Maintenance Allocation Chart (MAC), Appendix B of this manual.
2-3.
Repair Parts. Repair parts are listed and illustrated in the Repair Parts and Special Tools List (RPSTL), TM 55-
1905-223-24P.
SECTION II. SERVICE UPON RECEIPT
2-4.
Checking Unpacked Equipment.
a. Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report the
damage in accordance with the instructions of DA Pam 738-750.
b. Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies in
accordance with the instructions of DA Pam 738-750.
c.
Check to see whether the equipment has been modified.
d. Remove protective caps, plugs, inserts, wrappings, and tape when inspection/inventory is completed. Inspect
piping openings for damage. Wipe off dirt, grease, or protective films at time of installation.
2-1
|
||