Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-18-1
Replace Dryer Heater Box Group.
This task covers:
a. Removal, b. Replacement.
INITIAL SETUP
Equipment Condition
Tools
Dryer removed, para. 2-89.
Tool kit, general mechanic's,
Cylinder assembly removed, para. 2-90.
Dryer rear bulkhead removed,
T o o l kit, electrician's,
Materials/Parts
Warning tags, Item 1, Appendix C
REMOVAL
Remove hexagon head capscrew (15).
a.
Remove hexagon head capscrew (14).
b.
Tag and disconnect electrical leads and remove thermostatic switch (13) from
c.
mounting plate.
Remove mounting plate and attached heater element (22) from heater box (1).
d.
NOTE
Pull mounting plate down and away from heater box
to remove.
Remove hexagon head capscrew (6).
e.
NOTE
These capscrews must be removed prior to heater
box and dryer rear bulkhead removal from the
cabinet.
Remove nuts, (12, 16), flat washers (11, 17), nuts (10, 18), flat washers (9,
f.
19), and bushing insulators (8, 20).
Remove bushing insulators (7, 21).
g.
Remove electric heater element (22) from mounting plate.
h.
Change 1
|
||