TM 55-1905-223-24-18-1
Replace/Repair Power Distribution Panel EP103.
2-188.
a. Removal, b. Repair, c. Replacement.
This task covers:
INITIAL SETUP
Equipment Condition
Tools
Emergency switchboard WHL/HSE/ELEX
Tool kit, electrician's,
PNL EP103 35AT circuit breaker OFF
and tagged "Out of Service - Do Not
Operate." TM 55-1905-223-10.
Materials/Parts
Circuit breaker P/N Q215H
Warning tag, Item 1, Appendix C
WARNING
Death, serious injury, or equipment damage
can result from contact with live electrical
circuits. Before beginning work on this, or
any other electrical equipment, turn power
and control voltage circuit breakers OFF and
tag "Out of Service - Do Not Operate."
Refer to the procedures in paragraph 2-178 to replace and repair in the power
d i s t r i b u t i o n panel, door assembly, plug in breaker unit and main interior lug.