Tweet |
Custom Search
|
|
|
|||||
|
|||||
TM 55-1905-223-24-18-1
Repair Urinal.
REPLACEMENT
a.
Position urinal (4) on bulkhead.
b.
Install lockwashers (1) and nuts (2).
c.
Connect drain piping (3) to urinal.
Install flush valve (para. 2-327).
d.
e. Operate urinal and check for leaks around drain piping. Retighten connection
as necessary.
2-1030
|
|||||