Custom Search
 
  
 
TM 55-1905-223-24-18-2
3-27. Replace Vessel Subassembly (Third Stage).(Figure 3-24)
This task covers:
a. Removal,
b. Replacement.
INITIAL SETUP
Tools
Equipment Condition
Tool kit, general mechanic's,
Drain vessel (third stage) as specified
in paragraph 2-29 .
Materials/Parts
Vessel P/N 1334-4
REMOVAL
a. Ensure vessel is firmly secured for removal.
b. Remove four hex plain nuts (3) lockwashers (2) and machine bolts (1) securing mounting skid.
c. Remove third stage vessel.
NOTE
Disconnect piping system from vessel. Plug/cap all fittings and openings.
REPLACEMENT
a. Carefully position third stage vessel on mounting skid with mounting bolt holes aligned.
b.
Install four machine bolts (1), lockwashers (2) and hex plain nuts (3).
There are no torque
requirements.
NOTE
Unplug/cap all fittings and openings. Connect piping system to vessel.
c. Restore normal operation as specified in paragraph 2-29 .
3-108


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business