Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-18-2
This task covers:
a. Disassembly,
b.
Repair,
c. Assembly.
INITIAL SETUP
Tools
Equipment Condition
Tool kit, general mechanic's,
Vessel (second stage) removed as
specified in para. 3-29 .
Vessel cover removed as specified
Materials/Parts
in para. 2-30 .
Ball valve P/N VB62, VB57
Relief valve P/N VD33
Level switch P/N SX77
DISASSEMBLY
a. Disconnect ball valve (3), pipe elbow (2), and pipe nipple (1) from vessel cover.
b. Separate packing retainer (4) and preformed packing (24) from vessel cover.
c. Disconnect sight glass (23).
d. Disconnect relief valve (21).
e. Disconnect stop check valve (6), pipe nipple (7), and pipe elbow (5).
f. Disconnect and remove liquid transmitter (20).
g. Disconnect solenoid valve (16) and pipe nipple (17).
h. Disconnect ball valve (19) and pipe nipple (18).
NOTE
Filter elements are removed as specified in paragraph 2-38 .
i. Remove self-locking nut (11), packing retainer (12) and preformed packing (10).
j. Lift cover (9) and fluid filter element (13) off of support (14).
k. Lift ring support (8) and fluid filter element (13) off of support (14).
3-115
|
||