Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-3
e.
Install the water connection (9, Figure 2-50) tube, with a new gasket (10), and packing (5). Install hexhead
capscrews (6) and lockwashers (7) and flat washers (8).
f.
Install a new turbocharger mounting gasket a d the turbocharger (paragraph 2-30).
n
g.
Install the lube oil bypass filter (paragraph 2-35).
h.
Install the thermostat housing (paragraph 2-28).
i.
Install the water filter (paragraph 2-27).
j.
Install the air crossover pipe to the aftercooler (paragraph 2-41).
k.
Fill the cooling system (Table 2-1, item 24).
l.
Remove tags and turn on electrical power, start engine. TM 55-1905-223-10.
m.
Check for leaks and proper engine operation.
2-144
|
||