Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-5
CHAPTER 2
UNIT MAINTENANCE INSTRUCTIONS
Page
Section I.
Repair Parts, Special Tools; Test, Measurement, and
Diagnostic Equipment (TMDE); and Support Equipment ........................ 2-1
Section II.
Service Upon Receipt ............................................................................ 2-1
Section III.
Unit Preventive Maintenance Checks and Services (PMCS) ................... 2-6
Section IV.
Unit Maintenance Troubleshooting .......................................................... 2-22
Section V.
Unit Maintenance Procedures ................................................................. 2-54
Section VI.
Preparation for Storage or Shipment ...................................................... 2-165
SECTION I. REPAIR PARTS, SPECIAL TOOLS; TEST, MEASUREMENT,
AND DIAGNOSTIC EQUIPMENT (TMDE); AND SUPPORT EQUIPMENT
2-1. Common Tools and Equipment. For authorized common tools and equipment refer to the Modified Table
of Organization and Equipment (MTOE) applicable to your organization.
2-2. Special Tools, TMDE, and Support Equipment. Special tools; test, measurement, and diagnostic
equipment; and support equipment requirements are listed and illustrated in the Repair Parts and Special Tools
List (RPSTL), TM 55-1905-223-24P. These items are also listed in the Maintenance Allocation Chart (MAC),
2-3. Repair Parts. Repair parts are listed and illustrated in the Repair Parts and Special Tools List (RPSTL),
TM 55-1905-223-24P.
SECTION II. SERVICE UPON RECEIPT
2-4. Checking and Deprocessing Unpacked Equipment.
a. Inspect the equipment for damage incurred during shipment. If the equipment has been damaged,
report the damage in accordance with the instructions of DA Pam 738-750.
b.
Check the equipment against the packing slip to see if the shipment is complete.
Report all
discrepancies in accordance with the instructions of DA Pam 738-750.
c. Check to see whether the equipment has been modified.
d. Remove protective caps, plugs, inserts, wrappings and tape when inspection/inventory is completed.
Inspect piping openings for damage. Wipe off dirt, grease, or protective films at time of installation.
e. Remove chocks from resilient mounted components.
2-1
|
||