Custom Search
 
  
 
TM 55-1905-242-14
OPERATOR MAINTENANCE
FOR LANDING CRAFT, MECHANIZED (LCM-8) (ALL VESSELS WITH MOD 2 APPLICATION)
OPERATOR TROUBLESHOOTING PROCEDURES
FUEL SYSTEM
INITIAL SETUP:
Personnel Required:
References:
One Watercraft Enfineer, 88L
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
Fuel supply to the engines
1.
Check fuel level in both tanks.
Fill tanks as required.
is insufficient.
2.
Check fuel valve lineup.
Align fuel valves as required
for condition. Normally all
supply and return valves are
OPEN.
3.
Check the bowl on the fuel filter/water
If water is present, service
separator for the presence of water.
the fuel filter/water separator
4.
Check the fuel lines and hoses for leakage.
Repair leaks, or notify unit
maintenance for repair.
END OF WORK PACKAGE
0039 00-1/2 blank
0039 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business