OPERATOR TROUBLESHOOTING PROCEDURES
FUEL SYSTEM
INITIAL SETUP:
Personnel Required:
References:
One Watercraft Enfineer, 88L
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
Fuel supply to the engines
1.
Check fuel level in both tanks.
Fill tanks as required.
is insufficient.
2.
Check fuel valve lineup.
Align fuel valves as required
for condition. Normally all
supply and return valves are
OPEN.
3.
Check the bowl on the fuel filter/water
If water is present, service
separator for the presence of water.
the fuel filter/water separator
4.
Check the fuel lines and hoses for leakage.
Repair leaks, or notify unit
maintenance for repair.
END OF WORK PACKAGE