Custom Search
 
  
 
TM 55-1905-242-14
OPERATOR MAINTENANCE
FOR LANDING CRAFT, MECHANIZED (LCM-8) (ALL VESSELS WITH MOD 2 APPLICATION)
DUPLEX STRAINER, SERVICE
INITIAL SETUP:
Materials/Parts:
Tools and Special Tools:
Gasket, Cylinder (p/n 10, qty 4 )
Tool Kit, Mechanic's Rail and Marine (Item 1,
Table 1, WP 0230 00)
References:
TM 55-1905-242-24P (WP 0049)
Personnel Required:
One Watercraft Engineer, 88L
SERVICE
1.
Set the strainer handle (1) toward the strainer in use and away from the strainer to be serviced.
2.
Remove the wing nut (2), washer (3), end cap (4), and gasket (5) from the strainer not in use.
3.
Remove the screen (6) and cylinder (7) and clean them with fresh water. Use a wire brush, if necessary, to dislodge
particles from the screen. If the screen cannot be sufficiently cleaned, replace it with a new one.
4.
Install the gasket (5) in the housing (8).
5.
Install the cylinder (7), screen (6), gasket (5), and end cap (4) on the strainer not in use. Secure them with the washer (3)
and wing nut (2).
6.
Set the strainer handle (1) toward the strainer just serviced and check the strainer for leaks.
7.
Perform steps 2-6 for the other strainer.
4
6
8
7
5
5
3
2
1
END OF WORK PACKAGE
00660066 00-1
00-1/2 blank


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business