Custom Search
 
  
 
TM 55-1905-242-14
UNIT MAINTENANCE
FOR LANDING CRAFT, MECHANIZED (LCM-8) (ALL VESSELS WITH MOD 2 APPLICATION)
HAND PUMP, REPLACE
INITIAL SETUP:
Tools and Special Tools:
Personnel Required:
Tool Kit, Mechanic's Rail and Marine
One Watercraft Engineer, 88L
(Item 1, Table 1, WP 0230 00)
References:
Materials/Parts:
TM 55-1905-242-24P (WP 0068)
Sealant (Tape, Antiseizing) (Item 14, Table 2,
REMOVAL
1.
Remove the suction hose (1) and the discharge hose (2) from the hand pump (3).
2.
Remove the elbow (4), and reducing fittings (5) from the hand pump (3).
3.
Remove the bolts (6), nuts (7), and washers (8) that secure the hand pump (3) to the bulkhead and remove the hand pump.
INSTALLATION
1.
Position the hand pump (3) on the bulkhead and secure it with the bolts (6), nuts (7), and washers (8).
2.
Clean all the pipe threads with a wire brush and wrap the male pipe threads with antiseizing sealant tape.
3.
Thread the elbow (4) and reducing fittings (5) into the hand pump (3) and tighten them snugly.
4.
Attach the suction hose (1) and the discharge hose (2) to the hand pump (3) and tighten them snugly.
END OF WORK PACKAGE
01430143 00-1
00-1/2 blank


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business