Custom Search
 
  
 
TM 55-1905-242-14
UNIT MAINTENANCE
FOR LANDING CRAFT, MECHANIZED (LCM-8) (ALL VESSELS WITH MOD 2 APPLICATION)
WATER CLOSET FLUSHING SYSTEM, REPAIR
INITIAL SETUP:
Tools and Special Tools:
Personnel Required:
Tool Kit, Mechanic's Rail and Marine (Item 1,
Two Watercraft Engineers, 88L
Table 1, WP 0230 00)
Materials/Parts:
Multimeter (Item 2, Table 1, WP 0230 00)
Sealant (Tape, Antiseizing) (Item 14, Table 2, WP 0230 00)
Equipment Condition:
References:
W/C circuit breaker set to OFF, locked out, and
tagged out IAW FM 55-502
FM 55-502
TM 55-1905-242-24P (WP 0099)
REPAIR
Repair of the water closet flushing system is accomplished by the replacement of its component parts.
REMOVAL--FLUSHING VALVE
1.
Loosen the hose clamp (1) on the intake hose (2). Remove the intake hose from the hose fitting (3).
2.
Unscrew the hose fitting (3), elbow (4), and nipple (5) from the flushing valve (6). The hose fitting, elbow,and nipple may
be removed as an assembly if only the flushing valve will be replaced.
3.
Unscrew the flushing valve (6) from the flushing inlet pipe (7).
5
4
6
3
7
1
2
0156 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business