Custom Search
 
  
 
TM 55-1905-242-14
0166 00
INSTALLATION
1.
Attach the lifting device to the diesel generator.
2.
Carefully lower the diesel generator onto its bed in the engine room, taking care that the diesel generator does not foul
the starboard propulsion engine or any other equipment on its way into the engine room.
3.
Line up the diesel generator base with its mounting holes and secure it to the hull structure with the mounting bolts (52),
washers (53), and nuts (54).
4.
Uncap the fuel lines and fittings. Connect the fuel inlet line (48) to the inlet (50) fitting and the return (49) line to the
discharge (51) fitting using the labels from step 27 of Removal as a guide.
5.
Install and align the fire pump drive shaft (refer to WP 0145 00 and WP 0146 00).
6.
Connect the fire pump clutch wiring (46) in the junction box (47) using the labels from step 25 of Removal as a guide.
7.
Position the fire pump junction box cover (45) on the junction box and secure it with the screws (44).
8.
Connect the raw water inlet hose (42) to the raw water pump inlet (43) and secure it with the hose clamp (41).
NOTE
Do not install the top panels or the forward inboard panel at this time. These panels will
be installed later.
9.
Assemble the sound insulation frame (36) and panels (40) according to the match marks made during removal. Do not
install the top panels or the forward panels at this time. Secure the frame sections and panels with the screws (39).
10. Connect the quick disconnect plug (37) that connects the control wiring (38) to the main generator harness.
11. Position the forward inboard sound insulating panel (35) in place and secure it with the screws (34).
12. Feed the control box wiring (32) through the strain reliefs and secure it with the strain relief nuts (33).