Tweet |
Custom Search
|
|
|
||
(3) Operation. Figure 2-28 is a diagram of the
to the salvage connections. This system is used to
pump out any vessel, or barge, that is flooded or
sinking, by placing the suction hose into the 'flooded
area and pumping.
system, giving its function, location, and label
description. Table 2-15 lists the various operations to
be performed, valve positions, and procedures
WARNING
necessary to accomplish them. It is also keyed to figure
Do not attempt to pump oil, or any ex-
plosive fluid with the fire and salvage
pumps.
Figure 2-28. Fire and salvage system piping diagram.
Table 2-15. Fire and Salvage System Control Valve Positioning.
Operation
Open valve
Procedure
Supply fire water to engineroom
(19)
Connect hose to engineroom fire stations. Start electric fire
using electric fire pump.
(18)
pump. Secure pump and valves when finished.
(4)
(20)
Supply fire water to deck using
(19)
Connect hose to deck fire fire stations. Start electric fire
electric fire pump.
(18)
pump. Secure pump and valves when finished.
(3)
(21)
Supply fire water to engineroom
(6)*
Connect hose to engineroom fire stations. Start port and/or
using fire and salvage pump (s).
(7)*
starboard pump as required. When finished, secure
(9)*
pump (s). Secure all valves.
(14)**
*Open only if port pump is used.
(13)**
**Open only if starboard pump is used.
(11)**
(17)
(4)
(20)
2-54
|
||