MANUAL START:
1.
Ensure engine and jacket water cooling levels are at the proper operating levels.
2.
Line-up fuel system to allow engine, to take suction from and return to EDG day tank by opening valve F0-32.
3.
Prime fuel oil system on engine, if necessary, with engine mounted hand pump.
4.
Ensure battery charger is energized and batteries are charged. Either battery bank 1 or 2 may be used, both are
continuously charged.
5.
Set emergency switchboard engine control switch to hand.
6.
Release emergency switchboard engine control switch to hand.
7.
Start engine by turning panel switch to engine start.
8.
After engine starts, observe local instrumentation to verify proper engine operation.
9.
Allow engine to warm up until all temperatures and pressures have stabilized.
10. See switchboard operating instructions for placing generators on-line.
11. To secure engine, remove load (see switchboard operating instructions).
12. Allow temperatures to cool approximately 3-5 minutes if engine has been under load.
13. Place engine mode switch in the stop position.
AUTOMATIC START:
1.
Ensure steps 1-6 above are performed.
2.
Place model switch to the auto position.
3.
See switchboard operating instructions for automatic start sequence.
Placard 33. Emergency Diesel Generator (Sheet 1 of 2)