Tweet |
Custom Search
|
|
|
||
TM 55-1925-273-10-1
OPERATOR'S MANUAL
INLAND AND COASTAL LARGE TUG (LT)
OPERATION UNDER USUAL CONDITIONS
GETTING UNDERWAY
INITIAL SETUP:
Personnel Required:
References (continued):
Two Watercraft Operators, 88L
WP 0140 00 (volume 2)
Two Watercraft Engineers, 88K
WP 0141 00 (volume 2)
WP 0142 00 (volume 2)
References:
WP 0143 00 (volume 2)
TM-55-5825-311-10-1
WP 0144 00 (volume 2)
WP 0145 00 (volume 2)
WP 0146 00 (volume 2)
WP 0147 00 (volume 2)
WP 0148 00 (volume 2)
WP 0149 00 (volume 2)
WP 0150 00 (volume 2)
WP 0151 00 (volume 2)
WP 0152 00 (volume 2)
WP 0153 00 (volume 2)
WP 0154 00 (volume 2)
WP 0155 00 (volume 2)
WP 0156 00 (volume 2)
WP 0157 00 (volume 2)
WP 0158 00 (volume 2)
WP 0137 00 (volume 2)
WP 0159 00 (volume 2)
WP 0138 00 (volume 2)
WP 0160 00 (volume 2)
WP 0139 00 (volume 2)
GETTING UNDERWAY
Prior to getting underway, the following must be accomplished:
1.
All BEFORE Preventive Maintenance Checks and Services (PMCS) items (WP 0137 00 WP 0160 00, volume 2).
2.
Vessel prepared for use (WP 0068 00).
3.
Ship's Service Diesel Generator (SSDG) online; vessel on ship's service power (WP 0069 00).
4.
Compressed air system pressurized (WP 0070 00).
5.
Fire main and general service water systems online and pressurized (WP 0071 00).
6.
Main propulsion engines running and at operating temperature (WP 0072 00).
7.
Lube oil purification operating (as appropriate) (WP 0073 00).
8.
Fuel oil transferred to appropriate day tanks (WP 0074 00).
9.
Bow thruster engine running and at operating temperature (as required) (WP 0075 00).
10. Central hydraulic system online (as required) (WP 0076 00).
11. Steering system operating (WP 0077 00).
12. Potable water system online and hydropneumatic tank pressurized (WP 0080 00).