Tweet |
Custom Search
|
|
|
||
TM 5-1940-277-20
TM 1940-20/2
11.
Align cover and fasten with three flat washers (14) lockwashers (15 and screws (12).
12.
Tighten screws (12) with screwdriver.
13.
Attach connector nut (9) to electrical plug (10) and hand tighten.
14.
Attach adjuster mechanism (7) to adjuster rod (8).
15.
Rotate adjuster handle clockwise until V-belt (3) fits onto alternator pulley (6).
16.
Increase tension on V-belt (3) by turning adjuster handle (5) counterclockwise.
17.
Tighten belt until the free movement between the water pump pulley and alternator when pushed
is not in excess of 1/8-inch as shown.
18.
Replace buoyancy flotation material removed from port side (refer to paragraph 3-152).
19.
Close engine hatches.
|
||