Tweet |
Custom Search
|
|
|
||
TM 5-2010-205-14
4-11. FRAMEWORK ASSEMBLY
This Task Covers: a. Inspect
_____________
INITIAL SETUP
Tools Required
Equipment Conditions
None
Engine Shutdown (para 2-11).
Materials/Parts Required
Personnel Required
Cotton Rags (Appendix E,
1 person
Item 3)
INSPECT (Figure 4-1.)
1. Inspect for loose bolts.
2. Inspect for cracked welds.
3. Inspect for signs of rust and chipping paint.
Figure 4-1. Propelling Unit
4-14
|
||