Custom Search
 
  
 
TM 5-2010-205-14
4-28. GOVERNOR PUMP ASSEMBLY
This Task Covers: a. Inspect
INITIAL SETUP
Tools Required
Equipment Condition
Tool Kit, General Mechanics
Engine Shutdown (para 2-11).
Battery Disconnected (para 4-58).
Materials/Parts Required
Personnel Required
Cotton Rags (Appendix E,
1 person
Item 3)
INSPECT
1. Clean all connections to pump (1).
2. Inspect for loose bolts (2).
3. Inspect for leaks.
Figure 4-16. Governor Pump Assembly
4-41


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business