Custom Search
 
  
 
TM 5-2010-205-14
4-39.
VALVE MECHANISM ASSEMBLY
This Task Covers:
a. Inspect
INITIAL SETUP
Tools Required
Equipment Conditions
Tool Kit, General Mechanics
Engine Shutdown (para 2-11).
Battery Disconnected (para 4-58).
PCV Lines Removed (para 4-33).
Valve Cover Removed (para 4-30).
Materials/Parts Required
Personnel Required
Cotton Rags (Appendix E,
1 Person
Item 3)
INSPECT
1.
Inspect for loose nuts (1).
2.
Inspect rocker arm (2) for cracks or damage.
Figure 4-27. Valve Mechanism Assembly
4-62


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business