Custom Search
 
  
 
TM 5-2010-205-14
4-52. CONTROL PANEL ASSEMBLY
This Task Covers: a. Inspect
INITIAL SETUP
Tools Required
Equipment Conditions
Tool Kit, General Mechanics
Engine Shutdown (para 2-11).
Battery Disconnected (para 4-58).
Materials/Parts Required
Personnel Required
Cotton Rags (Appendix E,
1 person
Item 3)
1. Inspect for damage.
2. Inspect fire extinguisher (1) for proper charge.
3. Inspect for leaks.
Figure 4-41. Control Panel Assembly
4-91


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business