Custom Search
 
  
 
TM 5-2805-261-13
4-23. TEST STOP (SHORTING) SWITCH
This task covers:
Testing the stop switch.
INITIAL SETUP :
Tools:
Equipment Condition:
Motor OFF
Materials/Parts:
None
Personnel Required:
Approximate Time Required (minutes):
1 Mechanic
20
LOCATION/ITEM
ACTION
REMARKS
Set up and zero.
Follow manufacturers' directions on multimeter.
TEST FOR
1. Terminals
Disconnect.
2. Meter probes
Attach one to each end of
Follow test directions as outlined in para 4-13.
wire.
3. Terminals
Replace if necessary.
TEST FOR SHORT
CIRCUIT
1. Terminals
Disconnect.
2. Meter probes
Attach one to one terminal
Follow test directions as outlined in para 4-14.
and one to the other
In addition, test switch with button in two positions:
terminal.
a. Depressed.
b. Not depressed.
3. Switch
Replace if necessary.
4-32


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business