Tweet |
Custom Search
|
|
|
||
TM 5-2805-261-13
LOCATION/ITEM
ACTION
REMARKS
5-9. ENGINE DISASSEMBLY/ASSEMBLY - continued
13. Needle bearings and
Install.
Smear a little heavy grease in connecting rod. Place
retainers.
retainer half in con rod and install 6 needles. Bring
CAUTION
up to crankshaft. Using grease to hold needles, place
two end needles in positon.
Put other retaining half in place and install remaining needles.
Rods and caps have fracture
Put rod cap in place and install screws finger-tight.
joints that must match per-
Then install bearings in other rod the same way.
fectly. Snug rod cap screws
and feel machined surface
of rod with finger nail. If
alignment is not perfect,
tap rod cap lightly with a
mallet from several direc-
tions and snug screws again
when alignment is correct,
torque screws to 29-31
ft. lb. (40-42 Nm).
14. Connecting rod
Install and tighten to a torque
of 29-31 lb. ft. (40-42 N ).
bearing caps
m
15. Crankcase
Apply sealant OMC no.
327361 and position on
cylinder block.
16. Four large capscrews
Install finger-tight.
(16) and washers (17)
17. Two allen screws (18)
Install finger-tight.
5-28
|
||