Custom Search
 
  
 
TM 55-1905-242-14
UNIT MAINTENANCE
FOR LANDING CRAFT, MECHANIZED (LCM-8) (ALL VESSELS WITH MOD 2 APPLICATION)
CLUTCH LINKAGE, ADJUST/REPLACE
INITIAL SETUP:
Tools and Special Tools:
Personnel Required:
Tool Kit, Mechanic's Rail and Marine
Two Watercraft Engineers, 88L
(Item 1, Table 1, WP 0230 00)
References:
Equipment Condition:
FM 55-502
Propulsion engines secured, locked out,
TM 55-1905-242-24P (WP 0012)
and tagged out IAW FM 55-502
GENERAL
The clutch linkage consists of the clutch cable extending from the pilothouse control head to the articulator and the control
unit, as well as the control rod assembly connecting the governor.
REMOVAL
1.
To disconnect the clutch cable from the control head in the pilothouse:
a.
Remove the center access plate in the pilothouse control console.
b.
Remove the three screws (1) and the retainer (2).
c.
Remove the pin (3) from the cable connector (4) and retainer plate (5).
NOTE
Cotter pins, lockwashers, locking nuts, and similar locking devices shall be discarded after removal and replaced with
new cotter pins, lockwashers, locking nuts and similar locking devices.
d.
Loosen the locknut (6) and remove the clutch cable (7) from the cable connector (4).
5
2
1
6
3
4
7
8
9
0084 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business